Spacepac Alitrak-DCT350 remote controlled electrical carrier on tracks was at work during the Micro-Tunnel construction in San Foca (LE), Apulia Region, Southern Italy.
The 1.5km long micro-tunnel, part of the TAP pipeline project, was successfully completed this spring using an Alitrak DCT-350 Crawler unit with remote control…
Fitted with Wireless remote Control and moving a specially built trailer, this unit allowed the construction team to move plant and equipment safely and in minimum time.. The site requirement was that the DCT0350P be capable of both carrying and towing heavy loads on inclines..
The adjustable and inclined crawler tracks allowed the DCT-350P to maintain full traction within the tunnel in both wet and dry conditions.